Dashboard
Real-time overview of device health, environment and consumption.
Quick sustainable actions
Sensor Readings
Chilled Supply Temp — 24h
StablePower Usage — 24h
31 kW avgNetwork Traffic
Battery Level
Carbon Emission
Makeup Water Usage
Device Location
Live Camera — Roof Plant North
RECDevices
Fleet of provisioned devices across this site and connected sites.
| Device | Site | Status | Battery | Firmware | Connectivity | Health |
|---|
Asset hierarchy
Site → Building → Plant Room → Device grouping used for fleet-wide policy and maintenance scheduling.
- Site: Taipei Nangang Tower
- Building A
- Roof Plant — Cooling Tower 1 (this device)
- Plant Room B1 — Chiller Unit 1
- Building A
- Site: Hsinchu Innovation Tower
- Building C — 14 devices
Multi-site monitoring
Sites online3 / 3
Total devices42
Devices in alarm2
Connectivity mix
BLE6
Wi-Fi21
LTE12
5G3
Live Operations
Every system in the cooling plant, grouped and glanceable, with thresholds and equipment health.
Live status
Equipment health
Cycles of Concentration
—
Target 4–6× for scale/corrosion balance
Energy by component
Device Controls
Direct actuation. Emergency stop overrides all automation.
Run state
Current state: Running
Switches
Sliders
Adjust a switch or slider to see the estimated CO₂e impact of that change here.
Operating mode
Network
Power profile
Automation
Rules that run without operator intervention.
| Rule | Trigger | Action | Status | |
|---|---|---|---|---|
| Night eco mode | 22:00 daily | Set power profile → Power saver | Active | |
| High conductivity blowdown | Conductivity > 2200 µS/cm | Blowdown valve → Open, Alert facilities | Active | |
| Low battery relay cutoff | Battery < 15% | Relay → Off, Notify operator | Active | |
| Weekly blowdown flush | Sat 03:00 | Run blowdown flush cycle | Paused |
Energy
Consumption, efficiency and cost tracking for the cooling plant.
Power usage — 7 day
Chiller load — 24h
Avg 68%Equipment energy breakdown
Cost & demand
ESG Dashboard
Carbon accounting first: Scope 1–3, avoided emissions and a live carbon log, mapped to GHG Protocol, CSRD, SASB, GRI and TCFD indicators.
Net total
Sustainable actions
Carbon log
| Scope | Entry ID | Category | Details | CO₂e (kg) | Month |
|---|
Energy & carbon
Energy consumption
—
Monthly total, all shifts
Renewable energy %
—
Carbon footprint
—
tCO₂e this month
CO₂ reduction vs. baseline
—
Refrigerant charge & type
—
Scope 1 relevant per GHG Protocol
Refrigerant leak rate
—
ASHRAE Guideline 3 target < 2%/yr
Water stewardship
Water consumption
—
Makeup water, monthly total
Water intensity
—
Per kWh of cooling delivered
Cycles of concentration
—
Higher = less blowdown per L cooled
Water risk area
Legionella control
Water treatment program
Waste & asset
Waste generated
—
Recycling rate
—
Battery health
—
Est. device lifetime
—
Daily / Monthly / Annual energy trend
Circular economy score
—
Design for disassembly, material recovery and reuse potential
Makeup water usage — 24h
Water balance
Operator safety status
Incident counter
0 this quarter
Worker exposure (noise/heat)
Training completion
94% of assigned operators certified
Accessibility compliance
Inclusive design score
8.7/10
Audit logs
1,204 events logged, immutable, 7-yr retention
Security compliance
Policy version
ESG-POL v3.4
Device ownership
Taipei Nangang Tower — Facilities Engineering
Data retention status
Firmware approval
Change history
Last change: firmware v4.2.1, 2 days ago, approved by J. Lin
Electronic signature status
Alerts & Notification Center
Warnings, errors, maintenance, firmware and security events.
| Type | Title | Details | Time |
|---|
Event timeline
Reports
Generate and export operational and ESG reports.
Daily
Shift-level device & sensor summary
Weekly
7-day operations & energy digest
Monthly
Full ESG + compliance packet
Annual
CSRD / GRI / TCFD-ready disclosure
Latest report preview
No report generated yet. Choose a period above.
Maintenance
Predictive maintenance driven by vibration, thermal and runtime models.
Remaining life
78% of rated component life remaining
Next service
Aug 14, 2026
Fan gearbox bearing inspection & lubrication
Predictive maintenance score
—
Lower risk of unplanned downtime
| Date | Type | Technician | Notes | Result |
|---|---|---|---|---|
| 2026-05-02 | Scheduled | J. Lin | Belt tension & filter swap | Passed |
| 2026-03-11 | Predictive | A. Wu | Vibration anomaly on condenser water pump 2 resolved | Passed |
| 2026-01-20 | Scheduled | J. Lin | Annual calibration | Minor finding |
Security
Device hardening posture, mapped to IEC 62443 and the NIST Cybersecurity Framework.
Security score
—
Composite of the checks below
MFA enabledEnforced
Device certificateValid to 2027-02
TLS statusTLS 1.3
Secure bootVerified
TPMPresent · attested
Encryption at restAES-256
Audit trailImmutable log
Login history
| User | Time | Result |
|---|---|---|
| mei.chen | Today 08:12 | Success |
| j.lin | Yesterday 17:44 | Success |
| unknown | Jul 1, 03:12 | Blocked |
API token management
| Token | Scope | Expires | |
|---|---|---|---|
| svc-telemetry | read:sensors | 2026-12-01 | |
| svc-dashboard | read:all | 2026-09-15 |
Role-based access control (RBAC)
| Role | Devices | Controls | ESG & Reports | Security |
|---|---|---|---|---|
| Administrator | Full | Full | Full | Full |
| Site Operator (you) | View / Control | Full | View | View |
| Auditor | View | None | Full | View |
| Guest | View | None | None | None |
Firmware
Over-the-air update management with signed release verification.
Current version
v4.2.1
Available update
v4.3.0
Update progress
Idle
Release notes — v4.3.0
- Improved vibration-based predictive maintenance model accuracy
- Edge AI inference latency reduced by 18%
- Security patch for TLS session renegotiation
- New conductivity sensor calibration curve
Firmware history
| Version | Released | Deployed | Status |
|---|---|---|---|
| v4.2.1 | 2026-06-20 | 2026-07-01 | Active |
| v4.2.0 | 2026-05-02 | 2026-05-10 | Superseded |
| v4.1.4 | 2026-02-14 | 2026-02-20 | Superseded |
API
Programmatic access to this device's telemetry and controls.
Endpoint
GET https://api.atlas9.example/v1/devices/CT1-ROOF/telemetry
Authenticate with a bearer token from Security → API token management.
Sample response
{
"device_id": "CT1-ROOF",
"chilled_supply_temp_c": 7.2,
"chilled_return_temp_c": 12.6,
"flow_m3h": 342,
"power_kw": 31.2,
"status": "online"
}
Digital Product Passport readiness
Material composition disclosedYes
Repairability index7.8 / 10
End-of-life instructions publishedYes
Audit Log
Immutable record of configuration changes and access, per ISO 27001 §A.12.4.
| Time | Actor | Action | Detail |
|---|
Settings
Preferences, accessibility and data governance.
Appearance
Dark theme
High contrast mode
Privacy & consent
Share telemetry for AI model improvementGDPR Art. 6(1)(a) consent
Data retentionSensor data kept for 24 months24 mo